Hey girls,
8 weeks until my due date and its pretty much bang on time for when our new house will be started!!

We have signed a fix price contract with a building company but there still seem to be a LOT of decisions to make.

Has anyone built before?
Anything you would change/do differently?
Any suggestions or comments to make my life easier??
Back to Top
Sponsored Links


Back to Top
floss View Drop Down
Senior Member
Senior Member
Avatar

Joined: 25 March 2007
Points: 702
Post Options Post Options   Thanks (0) Thanks(0)   Quote floss Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 7:20pm
We built our house and it was a bloody long process we signed the contract when I was 6 mths preggy with my oldest and finally moved in when I was 6mths preggy with the twins.

I found that I really had to be on the builders backs all the time as they were really slack, as my house is on the same land as my parents this made it a bit eaiser as dad would always go over and check them out. I think that you have to also make sure you really look into what is included in the costs as part of our costs included them painting it but only in one colour so everytime we wanted a feature wall it was going to cost us $500 in the end we painted ourselves. Also check things like when the put the oven in ours was meant to be white but they stuffed up and got stainless steel then said its to late to change, I hassled them so much they did change so don't let them get away with anything!
But in the end, I love our house and wouldn't change it so happy to be in it.
My beautiful big girl Sienna 15.04.06

Double the trouble double the fun Noah & Lola 10/11/07
Back to Top
Angs1982 View Drop Down
Senior Member
Senior Member


Joined: 15 July 2008
Points: 1049
Post Options Post Options   Thanks (0) Thanks(0)   Quote Angs1982 Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 7:36pm
Thanks heaps!!
Scarey how long it took though!! I hope we aren't in for a long wait.
Back to Top
Angs1982 View Drop Down
Senior Member
Senior Member


Joined: 15 July 2008
Points: 1049
Post Options Post Options   Thanks (0) Thanks(0)   Quote Angs1982 Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 7:36pm
Thanks heaps!!
Scarey how long it took though!! I hope we aren't in for a long wait.
Back to Top
MamaMore View Drop Down
Groupie
Groupie


Joined: 27 April 2010
Location: Lower Hutt, NZ
Points: 71
Post Options Post Options   Thanks (0) Thanks(0)   Quote MamaMore Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 8:33pm
I'm keen to hear people's experiences too. We're planning to have a company build our house to lock-up stage, then do the rest ourselves.

I'd love to hear from anyone who have physically done the work themselves if there's anyone out there
Back to Top
mrsturtle View Drop Down
Senior Member
Senior Member
Avatar

Joined: 02 July 2008
Points: 1472
Post Options Post Options   Thanks (0) Thanks(0)   Quote mrsturtle Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 9:04pm
We built in 07 began oct and we were in on 1st march 08. the builders did alot of the work then we did the painting, kitchen, carpets etc which tbh we should have just got the builders to do it all and i wasnt even pregnant! it just seemed to take forever and while we saved a wee bit it wasnt really that much in the scheme of things. Also the final consents were a bit more tricky to get thru and i just feel that it would have been easier to leave it all to the builders.

We built of our own plans that hubby desinged so not sure but if you were building one of their spec houses they should be able to do it quicker ??

My biggest thing that i would suggest is get a great relationship with your builder the guys on site makes it soo much easier and i constantly visited the site to see how things were going and i held them to the finish date as we were renting they were well aware that if we couldnt move in then they would have to pay for a motel till we could.

all the best it is stressfull and long but so worth it if you get what you want.
Back to Top
TrinaL View Drop Down
Senior Member
Senior Member
Avatar

Joined: 08 January 2010
Points: 439
Post Options Post Options   Thanks (0) Thanks(0)   Quote TrinaL Quote  Post ReplyReply Direct Link To This Post Posted: 18 April 2011 at 9:18pm
We built and did a lot ourselves. My father did the design and did the pm of the build using the builder that worked for him. DH broke his femur the month we started building

My thoughts are:
You will have to compromise on some things.

I wish we didn't get the shower we did. It looks nice, and it is nice to shower in but I hate cleaning it. Think about how things will be for cleaning.

I love our big spa bath to bath in but it is to high to lean over and bath a baby in

You can never have a too big garage- your DH will agree Love my full size washing line inside the garage.

You can never have too much storage

There may be some things you don't do straight away but think about if you can plan so it is easy to do later. We had the internal vac pipes put in but have only just bought the unit so we can use it.

I don't love having the same boring curtains all through the house but as it ended up costing us 1200 for 84m of curtaining and 500 to make them it got the job done and I will replace them as I can.

You can get lots of plants for landscaping formm garage sales and friends. Never say no to a free plant- if it doesn't survive the move it doesn't matter.
Back to Top
Angs1982 View Drop Down
Senior Member
Senior Member


Joined: 15 July 2008
Points: 1049
Post Options Post Options   Thanks (0) Thanks(0)   Quote Angs1982 Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 7:32am
That was a quick build Shannon! Our company doesn't have a set build time but hopefully they aren't too slow.
I'm kind of glad to hear you say the savings weren't really worth it for DIY. We are pretty happy to leave everything to them - but in the back of my mind I know we could save a bit.

Funny Trina its things like curtains that I'm most looking forward to doing - the finishing touches, but I know that takes $$$$.



Back to Top
GuestGuest View Drop Down
Senior Member
Senior Member


Joined: 21 April 2008
Points: 3600
Post Options Post Options   Thanks (0) Thanks(0)   Quote GuestGuest Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 10:58am
Good thread, would good to get some more feedback!

We are building later this year and have decided to go with a building company that does the lot rather than go it alone to take the stress out of it. It's so much fun choosing a plan and trying to visualise all of the interior design! At the moment we're arguing over whether or not to have a sink in the scullery
Back to Top
Mum_mum View Drop Down
Senior Member
Senior Member
Avatar

Joined: 30 April 2008
Location: NZ
Points: 1394
Post Options Post Options   Thanks (0) Thanks(0)   Quote Mum_mum Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 1:30pm
ooooo I think a sink in the scullery would be a good thing Red, especially for doing things like filleting fish (if your DH does that lol) defrosting meat, and just washing yucky things.....

Angel baby - May 2008
Back to Top
LadyBee View Drop Down
Senior Member
Senior Member


Joined: 28 February 2009
Location: Christchurch
Points: 3287
Post Options Post Options   Thanks (0) Thanks(0)   Quote LadyBee Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 1:30pm
Some things I would suggest is to choose a builder who is reliable and good at what they do! There are so many cowboys around you need a Licensed Trade Qualified builder perferably Certified or a master Builder aswell. Get recommedations from friends/family or ask around at work and if you can see the work they have done.

Meet with the builder (who is actually going to do the building work) and discuss exactly what you want also once you have decided who you want to build with have a fixed price contract with specs (inclusions/exclusion) and start and completion dates so you are clear on what is going on. Remember there are sometimes unexpected costs so be prepared for this esp if you decide to change something halfway through the build.
Best thing is know exactly what you want and stick with it.

Unless your dam confident you can DIY but I would leave it up to the builders / subcontractors to do the work. To get a professional finish you need a professional to do it and I know it looks simple it do, I mean its only painting walls, laying tiles etc etc there is actually a lot of work behind it and you dont save much money in the end, The time and stress of it is not worth it.
Its best to stick with the fun parts like choosing colours/carpet/lights etc and let the builder do the hard work.

Yes its good to have a good relationship with the builder, scones and bickkies go a long way
And remember before its all done walk around and check it yourself, dont be afraid to speak up if your not happy with the quality of finish. Nothing worse if your all moved in and have an endless supply of contractors fixing this or that or you have to move back out so they can patch it up or re paint.

GL building is exciting if you have a good builder/building company it should be a breeze



Edited by LadyBee
TTC for 4 1/2 years
IVF #1 - April 2012 short BFP, no frosties
IVF #2 - August 2012, BFP!! 3 frosties!

Back to Top
linda View Drop Down
Senior Member
Senior Member
Avatar

Joined: 02 September 2003
Points: 1211
Post Options Post Options   Thanks (0) Thanks(0)   Quote linda Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 3:10pm
We had stage one built before kids and DH did most of that. Then got stage two completed to lock up. The last part of stage two was knocking the wall between the two stages. DH then did the interior but I would have to say it felt like it took forever and rather than having family time it felt like he was always working on the house. Got to the stage where I really resented the house. We are now onto stage three, and are going to see how far we get the builders to go. We pay by the hour and have accounts set up for building related items. For us it worked really well and the same builder who did stage two is doing stage three.

Good luck!


Alex 6 and Harry 8
Back to Top
MamaMore View Drop Down
Groupie
Groupie


Joined: 27 April 2010
Location: Lower Hutt, NZ
Points: 71
Post Options Post Options   Thanks (0) Thanks(0)   Quote MamaMore Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 4:50pm
Wow, some of this advice is gold! Thanks ladies. Our plan is that DH will take 6 months off work and basically work full time on the house. I don't mind if it's not totally finished before we move in as we DIY'd the house we're in so I'm not afraid of that, but it'd be great to have the major stuff done.

Looking forward to reading more advice and tips
Back to Top
floss View Drop Down
Senior Member
Senior Member
Avatar

Joined: 25 March 2007
Points: 702
Post Options Post Options   Thanks (0) Thanks(0)   Quote floss Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 8:38pm
Oh the other thing I would check is the lighting plan, we added heaps more lights to our plan as the house would have hardly any without them and we have quite bit rooms so 1 or 2 lights just wasn't going to cut it.

Along with the lights we now have the problem that we can't reach the light switches for the lights above our bed without nearly falling out of the bed. The guy just stuck the light switches where he thought they should be without checking he must have thought our bed was HUGE!
My beautiful big girl Sienna 15.04.06

Double the trouble double the fun Noah & Lola 10/11/07
Back to Top
TrinaL View Drop Down
Senior Member
Senior Member
Avatar

Joined: 08 January 2010
Points: 439
Post Options Post Options   Thanks (0) Thanks(0)   Quote TrinaL Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 8:59pm
Originally posted by Angs1982 Angs1982 wrote:

Funny Trina its things like curtains that I'm most looking forward to doing - the finishing touches, but I know that takes $$$$.



There are some gorgeous curtains out there but couldn't justify the expense - some of those compromises I mentioned
I figured I could slowly work my way through the house and replace them over time if I wanted to. We did get sun filter blinds which were more imprtant for cutting down the glare and blocking the sun in the heat of summer.
Back to Top
mrsturtle View Drop Down
Senior Member
Senior Member
Avatar

Joined: 02 July 2008
Points: 1472
Post Options Post Options   Thanks (0) Thanks(0)   Quote mrsturtle Quote  Post ReplyReply Direct Link To This Post Posted: 19 April 2011 at 9:47pm
Fantastic point about the lights floss! our kitchen lights are pretty crap....not over the bench grrr
and also power points! you can never have too many trust me
Back to Top
Lulu View Drop Down
Senior Member
Senior Member
Avatar

Joined: 01 January 1900
Location: New Zealand
Points: 849
Post Options Post Options   Thanks (0) Thanks(0)   Quote Lulu Quote  Post ReplyReply Direct Link To This Post Posted: 20 April 2011 at 7:33am
We have built one house, done a full renovation (almost a demolish/rebuild situation) on another, relocated another house with another full renovation. My personal criteria for any future builds is that it is FULLY finished before I move in - even down to the landscaping. In the past due to budget restraints we have always moved in well before things are finished, and I reckon this just drags it out and the only time you ever get everything fully completed is if you are moving out or selling!
Like the lighting situation, make sure you have enough power points and they are in the right positions, especially in the kitchen.
Lou
Back to Top
GuestGuest View Drop Down
Senior Member
Senior Member


Joined: 21 April 2008
Points: 3600
Post Options Post Options   Thanks (0) Thanks(0)   Quote GuestGuest Quote  Post ReplyReply Direct Link To This Post Posted: 20 April 2011 at 10:10am
Originally posted by shannon shannon wrote:


and also power points! you can never have too many trust me


With you there!!
I'm not so worried about lights because we like to use lamps in the living areas. I'm not a big fan of light shining down from the ceiling for some reason.

Does anyone have bi-folds? I really like them compared to sliders but they are more expensive. Are they worth it?
Back to Top
mrsturtle View Drop Down
Senior Member
Senior Member
Avatar

Joined: 02 July 2008
Points: 1472
Post Options Post Options   Thanks (0) Thanks(0)   Quote mrsturtle Quote  Post ReplyReply Direct Link To This Post Posted: 20 April 2011 at 3:11pm
not sure about bifolds we have triple stackers but makes the doors pretty heavy to slide compleatly open
Back to Top
Angs1982 View Drop Down
Senior Member
Senior Member


Joined: 15 July 2008
Points: 1049
Post Options Post Options   Thanks (0) Thanks(0)   Quote Angs1982 Quote  Post ReplyReply Direct Link To This Post Posted: 20 April 2011 at 5:52pm
We are getting bi-folds put in, hopefully they are ok!

Got plans back today... the fun begins.

Interesting got info today about all the new carpets - can't believe the guareentees they come with. $$$$ tho.... but maybe worth it with kids?

Good point on the lights etc, its hard to know tho when you look at plans!
Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 1.203 seconds.